Hi — I'm Vance.
I help with Koneta / KN Rubber' molding operation — molds & tooling, presses & machines, molding jobs, QC & defects, UN/DOT cert testing, mold & press PM, materials, and the software/hardware you run across all five plants. Ask me anything, or start with one of these:
Vance is the ElastoOps AI · replies are saved to your conversation
Show Vance a photo
Snap a cured part, a compound/mix sample, a mold or mill surface, or a press — Vance looks and tells you what it sees, on our own GPU. Decision support, not an inspection of record.
Saved to a cure batch / press run
Photos and Vance's reads you've attached to a batch/run — newest first.
Molding Ops
Molds & tooling, presses, molding jobs, QC & defects, UN/DOT cert testing, and shot-count mold PM — captured so the knowledge stays on the floor.
Jobs by status
Top defects
Molds due PM
Log a QC check
Quick-log a dimensional, visual, functional, or SPC result against a job — with optional defect classification.
Recent checks
Latest QC across all jobs.
Recent cert tests
UN/DOT and packaging certification results.
Log mold PM
Shot-count-based preventive maintenance. Logging here resets the mold's last-PM shot counter.
Recent PM
Latest mold PM across all tooling.
Daily Huddle
Here's where things stand today.
Needs attention today
What's next
Where your ElastoOps journey is heading. Tap to steer the build order.
To-Do
Recent activity
Your data is yours
Download a full backup anytime, or restore from one. Access tokens are never included and never touched by a restore.
My ElastoOps
You're in the driver's seat. Steer what gets built next, set the priorities, shape how Vance works for you, and bring your team along.
What Vance can cite
Grounded areas vs honest gaps. Missing plant records are your to-do list — not a product failure. SAMPLE fixtures never count as Koneta limits.
Still needed from the plant
Your ElastoOps Journey
From first contact to your own ElastoOps node — running on your hardware, at Koneta / KN Rubber. Tap I want this next on anything to steer the build order.
Needs
Everything you've raised — drive each one: set its status, priority, and which project it belongs to.
Projects
Your structure for the work. Needs can be filed under any project you create here.
Settings
Your preferences. These shape how Vance talks to you and how we reach you.
Invite your team
You control access. Add a teammate and we'll mint them their own private link.
Conversation
Results
A live look at everything in motion.
By department
Tap a card to see just that conversation.
Projects
Needs by department
By status
Intake over time
Safety
Workplace safety & OSHA compliance for your rubber plant — grounded in the official standards, plainly explained. Decision support, not legal advice.
Watch these today
Standing hazards for a rubber-molding plant — surfaced without being asked.
Look up a standard
Browse by hazard
Your plant's applicable OSHA standards, grouped by domain. Tap a group to open it.